The receiving sample should represent the input batch, and the result should show not only the removed defects, but also the loss of suitable grain.
Before roasting, you can divide the flow by size and visible differences, remove some heavy, light or metal impurities by separate nodes, select the sequence according to the known composition of the lot and the purpose of the product, assess the quality by material balance and repeated manual check of all fractions.
SORTING / CONTROLS/QSYSTEM/CRITYEXIT
01/QUICK VERDICT
Make a map of defects and physical features, then assign each feature a suitable stage instead of trying to solve all the problems with one machine.
02/checklist
Verification before the next decision
Mark the item closed only when there is a document, measurement, observation or designated responsible person.
01
select a representative sample with preserved identity
02
describe defects with photographs and physical samples
03
assign a sign: size, color, density, metal or light impurity
04
coordinate the order of nodes and number of passes
05
weigh the entrance, the fitting exit and every break
06
Check pass and false selection manually
07
to establish purification and traceability between batches
03/technique
From Initial Data to Verified Results
Each stage preserves the boundary between the revealed fact, the editorial method and what still needs to be confirmed.
01
Start with the correct sample
A sample from the top layer of the bag or a pre-selected handful may not represent the batch. Describe the method of sampling, combining and dividing the sample, save the batch number and the original control sample. The supplier of the machine must receive the material without prior improvement.
source
selection
sealed
02
Link each defect to the observed trait
The sieve sees the size, the optics see the available external difference, the magnet sees the ferromagnetic material, and the destoner uses the different flow behaviors. One defect may not have a stable external feature, and these constraints are fixed before the test.
defector
physics
known blind spots
03
Determine the sequence of operations
Pre-removal of large impurities or sizing alignment can stabilize the next step, but adds output streams, heights and purification.Compare multiple sequences on a single material and don't skip the product again without a separate result label.
gateway
nomination
batch
04
Consider the full material balance
Weigh the original sample, the main product, all the fractions and the technical residue. Manual check of the received flow shows the pass, and the analysis of the cutoff shows the loss of good grain. The result without the sum of the flows does not allow you to estimate the useful yield.
mass
defect
kernel
05
Transfer the test to the acceptance protocol
Record the recipe, the tempo, the surrounding conditions, the number of passes, the air settings and the shelf life criteria. To commission, prepare a new closed sample to test reproducibility, rather than repeating the work on a familiar sample.
saved configuration
receptionist
signatures and source files
05/frequently asked questions
Before testing or requesting the supplier
Short answers retain the same limitations as the main material.
01Do I need to calibrate coffee by size first?+
Not always. It depends on the purpose and the heterogeneity of the batch. Compare the sequences on one sample and evaluate whether calibration improves the useful result of the next step.
02Will the color sorter remove the stones?+
Only if a particular system consistently sees them as a predetermined difference, and the test confirms this. For density differences, a separate destoner is usually considered; metal inclusions require their own control.
03Can I use one setup for all deliveries?+
There's no reason to think it's universal. Origin, processing, humidity and appearance change, so the recipe is tested on each significantly different batch group.
04What to do with the rejected stream?+
It's identified, weighed, checked and sent according to an approved procedure, so you can't bring it back to the main stream before analysis, otherwise the material balance and traceability are lost.
07/Next step
Compare the defect and the principle